Monday, May 28, 2012

Over the winter, all of the critical issues on my work list were completed.

  • New topsides paint job
  • Wooded and refinished both masts
  • Installed new RayMarine AIS 650, which necessitated re-engineering the entire NMEA 0183 logging system.
  • Replaced broken cockpit shower head.
  • Reconnected the VHF to the GPS, so its SOS function works correctly.
  • Installed the new ship's whistle, with a wireless remote controlled switch.

We launched RUNE early, March 30.

Monday, September 26, 2011

Fall refit plans

Two weeks ago I was out for a sundown cruise with a local judge. I handed him the tiller while I stowed the mooring lines, and we immediately went aground, in the channel, on a little sand bar built up by Hurricane Irene. He was slightly embarrassed, but I was really lucky to have dodged the bullet. After all, it's my home river, and I'm supposed to know it well, but I would have probably gone aground just as he did. We were well aground; it took a tow from an amused but charitably inclined powerboat to pull us off.

This fall I had planned on early haulout, but I shall keep it in for my son to use on Columbus Day. In the off seasons, I plan to:
  • Check the keel for damage from the grounding
  • Replace the analog instruments: fathometer, knotmeter, and apparent wind gauge.
  • Install a remote control whistle
  • Strip and repaint the topsides
The instruments are in sad shape. The depth sounder display is crooked in its case and can't be adjusted; the depth sounder measurement is completely unreliable and chaotic; the wind direction is in error and can't be re-calibrated; the knot meter paddle wheel sensor seems to be jammed. Last night the radar display went completely nuts; its screen was covered by vertical and horizontal stripes.

First the radar/chartplotter: Raymarine says the problem is probably a loose or corroded internal wire--rap the plotter case sharply to see if it will fix itself for the rest of the season, then send it to the Manchester repair center when I haul the boat.

I spoke to Moor electronics (800-876-4971) who manufacture an old-fashioned set of round instruments. Their acoustic transducer is 200 KHz, and uses an RCA plug for its connection. It may be compatible with the Datamarine fathometer, but it would need checking. Their wind instrument uses only 4 wires vice the 9 wires used by the Datamarine I have now. Their paddle wheel sensor fits into the same size hole, but it's not clear whether I can still use the same through-hull.

The downside to the Moor instruments is that they have no connection to an NMEA bus, so they are completely standalone.

Other options:
Euro Marine Trading
(Newport, RI USA)
NKE "Ultrasonic Speedo", "Topline"
www.euromarinetrading.com

All instruments, even analog, have a similar, square bezel.


Nexus Marine/Ocean Equipment
(Irvine, CA)
"Nexus" digital, analog repeaters
www.oceanequipment.com


All instruments have a similar, square bezel.

Ockam Instruments
(Milford, CT USA)
Digital system modules
www.ockam.com

Square bezel again

Raymarine
(Merrimack, NH USA)
"ST" Series
www.raymarine.com
SignetMarine
(Redondo Beach, CA USA)
"SL11 self-powered analog knotmeter" & "SL" & "SmartPak"
www.signetmarine.com

This one looks like a WINNER! I shall check it out.

Simrad (Navico)
(Tulsa, OK USA)
"IS20" digital
www.simradyachtingusa.com

Square bezel, shallow surface mountable.

Tecnautic (Electronics)
(West Hills, CA USA)
"Log-6" digital with paddlewheel sensors
www.tecnautic.com

Interesting system: hexagonal bezels; single wire interconnect bus; configurable displays.

Velocitek
(Paia, HI)
Portable GPS speed, heading & VMG unit
www.velocitek.com


Wireless display for GPS-based data; not what I need.


This summer, I had a near-collision with an oblivious powerboat in which I found myself needing immediate access to a sound signal. I have found a wireless remote-control relay, the control for which I intend to install into the tiller, to activate the ship's whistle from the steering station. I shall have to check the range of the remote control; the relay may have to be mounted near the cockpit to ensure a reliable connection. I shall install the whistle itself on the ship's bell socket, mounted on the front of the main mast, so it can be easily removed. I shall install a new control wire for the whistle into the mast, coming from below.

For the topsides work, Snediker has asked me to move the boat to Mystic Shipyard, so he can use their climate-controlled shed for the two-part epoxy base coat. We shall see.

Friday, May 20, 2011

Is it Spring Yet?

This year we launched Rune early, but I still haven't sailed her, because each day for the last three weeks has threatened, promised or begun with rain. I sympathize with a pallid reflection of the pain and loss of the flooded Hoosiers and the Cajuns holding their breaths for the spring crest to arrive.

I am planning for a day sail on Monday, though. We have a stunning soprano opera singer as guest for the weekend, and I invited her to stay an extra day, hoping the clouds will clear.

I still don't see any big projects for the year. I spliced a new topping lift; I have spent the dank evenings varnishing things I could bring to the basement; I invented and built a folding storage bracket for the smokestack we remove when it's not being used.

Other than that, I just have been mourning the passing of the season, hoping for a sunny day.

Thursday, April 28, 2011

Spring commissioning

As is clear from the dates of the previous entries I lost my enthusiasm for contemporaneous narration. The frames and planking were completed, and the boat was launched late in August 2009. Its launching was marred by one seam from which the caulking fell out before the hull swelled. The leak was pretty dramatic, but she made it safely back to the Frank Hall Boat Yard, to be hauled, recaulked and relaunched.
The boat was tight and dry that fall when at the dock, but as soon as it got underway, there was a substantial leak near the stem. In December 2009, I brought the boat to Dodson's Boatyard, because it was the only yard still operating, to be hauled and transported back to Taylor and Snediker's shop. They found a joint between the stem and gripe in which the stopwater had not been correctly placed, when she was built. It just so happened that the joint was above the actual waterline when she was moored, but below it when she sailed. At first, the mating parts shut out the sea, but over the years, the two butting planks slowly developed enough checks so the stopwater was needed, and it proved insufficient to the task. The joint was reworked by Scott Gifford, and the boat saw a reasonably full season in 2010.
Overall, this year's commissioning has been really easy. Rune was launched on 4/10/11, and the hull swelled quickly to eliminate the minor leaking. Her masts were stepped on 4/19, and she has moved to her summer dock. I am finishing the Spring Checklist, and the varnish team from T&S is waiting for enough sequential sunshine to finish the topsides and brightwork.

Tuesday, May 19, 2009

After two weeks of sturm und drang, it seems that the lamination problem is becoming clear.
Snediker found a source for the Aerodux-500 glue in England; they agreed to ship it to him. He had to pay the manufacturer to pack and ship it to him, since the uncured glue is classified as a "Hazardous Material", and it would have to be flown internationally, and brought through customs.
The package didn't come when it was supposed to. After two weeks of international phone calls, and post-event analysis of tracking, mis-shipping, and slow handling, it seems that the paperwork got separated from the shipment, so it sat in the UPS Boston terminal without being identified, waiting to be straightened out, for three or four days.
About a week after the shipment was supposed to be here, I strongly suggested we speak to Gougeon Bros about the folklore which said that white oak couldn't be glued with epoxy, and see what could be done.
Their engineer spoke with Dave, and admitted that there could be a problem with laminating bent frames. He said that the cause is not maladhesion, or any weird characteristic of the wood, but glue starvation in the lamination, caused by the force applied to the laminations required to shape the frame.
He suggested the following procedure:
Coat
semicure
recoat
cure
test
After hearing about this discussion, Andrew mentioned that he had also used large (quarter-millimeter) glass spheres mixed into the glue (although he didn't know of a source) or short lengths of monofilament laid in the glue, to prevent the same problem.

Thursday, April 23, 2009

Frame end progress

Work has stopped on scarfing the frame ends. We have installed the laminated ends which were completed, but now we have no more glue.
The only glue I know of that is really satisfactory is the Aerodux-500, and yet that seems not to be available. As of Tuesday afternoon, the distributor in California admitted that he did not have it in hand.
We sought alternatives. We made up sets of laminations using epoxy, Weldwood resorcinol clamped lightly,and Weldwood clamped tightly. We then broke them using a weight suspended below a fork lift. We also broke a sample of the Aerodux which had been cut off of frame scarfs.
The Weldwood failed completely. The glue itself split apart, indicating its cohesion failed rather than its adhesion to the oak slats. DAP system engineers promised an investigation, if we would send them our lamination and glue batch.
The epoxy was very strong; the glue sucessfully adhered, until the slats themselves split apart. We would use epoxy, except for the folklore we have heard, which says that West system epoxy does not adhere to oak.
The Aerodux scrap also broke by wood fiber failure, rather than by failure of adhesion or cohesion. In view of the poor reputation that epoxy has with oak, I am planning to wait for the Aerodux.
Work therefore has begun on reinstalling the rudder. Fitting it in place, using the replacement shaft, showed that we need a little more trimming on the dutchman at the top of the stern post, and I am doing that. When that fits, we will install the bottom bearing.
Roger is shaping the false keel timber, using his favorite adze. It should be done quickly.
We discussed the false keel liner. Its failure was due to delignification of the wood next to the bronze liner, and excessive wear at the bottom opening for the centerboard. The bronze liner was not reusable, and a replica would have been awkward and unsatisfactory to install. Instead, the present plan is to line the false keel with G-10 FRP, and install a UMHWP (ultra-high molecular weight polyethyline) replaceable wear insert on both sides of the bottom opening, to carry the side load of the centerboard. We will attach the G-10 with West System G-Flex, which is designed for gluing plastic to wet wood. The UMHWP, formed into a 1" by 2" bar, will be attached behind the bronze worm shield with wood screws. All the parts have been ordered.

Wednesday, April 15, 2009

Frames update

Four new laminated frame ends have been built, and number 29 has been installed. (pictures coming) Each frame end is scarfed to the upper frame and the half-lapped scarf is secured with a bronze strap. A bronze flat head machine screw goes through the doubled layer of planking, the frame and the strap, secured by a bronze washer and a heavy nut. The end of the bolt is cut to size and punched to secure it.
The same scarfing procedure has been followed for the forward frames, numbers 13, 15, 17 and 19, except that the shape of these frame ends is straight enough so they can be shaped from ordinary planks, instead of multi-ply laminations.
In summary, the status is that all the floors from 24 to 12 are now fitted in place; those from 29 to 23 are fitted, but are being temporarily removed, one or two at a time, for ease in installing the frames. The odd frame ends are being installed first; 13, 15, 17, and 29 are done.
We are now held up because of a shortage of glue. Snediker recommended that the frame ends be laminated using Aerodux-500. Apparently, though, the only US supplier is in California and not too responsive. At any rate, we have used up T&S's supply and are awaiting more.