Monday, May 28, 2012

Over the winter, all of the critical issues on my work list were completed.

  • New topsides paint job
  • Wooded and refinished both masts
  • Installed new RayMarine AIS 650, which necessitated re-engineering the entire NMEA 0183 logging system.
  • Replaced broken cockpit shower head.
  • Reconnected the VHF to the GPS, so its SOS function works correctly.
  • Installed the new ship's whistle, with a wireless remote controlled switch.

We launched RUNE early, March 30.